We recommend a minimum 2 lap for shingles but you may adjust this to better visually coordinate the row lines to the trim or other siding materials.
Poplar bark siding installation.
Elevate the bark siding at least 1 above any roofing or decking and use flashing.
Roofing underlayer should be inserted.
Today poplar bark is a top choice and provides rustic beauty as well as effective protection from the elements.
Aah recommends 5 bark lock screws per sf of bark being installed.
Bark is attached with aah bark lock 2 screws.
Stack siding off the ground and under cover.
Stored siding should be 4 to 6 inches above the ground with air circulating freely around and throughout the stack.
Whether you want your house to stand out from other homes or to blend more seamlessly into its surroundings poplar bark siding provides unrivaled elegance style durability and a rustic charm that is all its own.
Fastener lengths are determined by the thickness of the bark being attached.
After chalking off the next course apply the roofing felt to the chalked lap line.
Fasteners must be long enough to completely penetrate both pieces of bark through the overlap and.
Bark house poplar bark siding and wall tiles are manufactured from the peeled bark of tulip poplar trees liriodendron tulipifera.
Poplar bark siding is extremely resilient beautiful and natural.
Bark is hydroscopic meaning that it is constantly pulling moisture in.
The bark which is historically a waste product in lumber operations is harvested to become siding and wall tiles before the logs reach the mill.
Use chalk line to determine rows.
Homes can be fully clad with bark siding or it can be added as a one of a kind accent to your house even on the inside.
The bark should be protected with a waterproof covering elevated in the center so that water does not pool on the cover.
Below is a list of guidelines to follow when installing parton lumber s poplar bark siding.
To harvest the bark a kerf or groove is cut down the length of a newly cut log and the bark is actually pried and peeled off.
For 18 bark we recommend a 6 overlap during installation to net a 12 bark exposure on the surface.
The curved bark is then stacked flattened and air dried.
If the bark is to be stored over damp ground or concrete place a moisture barrier under the siding.
Keep the poplar bark dry prior to installation.